The Dulacore Split Bollard Funnel makes filling bollards easier—even when a signpost or other obstruction is already installed.
Unlike a traditional one-piece funnel that has to slide over the top of the bollard, the split design opens up and installs around the post, allowing you to funnel concrete directly into the bollard without removing or working around the sign.
Built for contractors who deal with bollards in real-world conditions, the Split Bollard Funnel helps reduce spills, wasted concrete, and the aggravation of trying to fill around an obstruction.
Split Funnel 6- Recommended if you pour mainly 6" bollards for max flow
Split Funnel 6/4 -Maximum versatility. Best when you regularly encounter both bollard sizes. For Best Results: Higher-slump concrete and smaller aggregate, such as pea stone, will generally flow more easily through the 6/4 Funnel and help reduce the potential for clogging.
Features:
-
Split design installs around pre-installed signposts
-
Quickly assembles around the bollard
-
Large opening makes pouring concrete easier
-
Helps keep concrete off signs, posts, and surrounding surfaces
-
Durable, reusable construction
-
Designed specifically for jobsite use
- Made for 6" and 4" bollards
- a wetter and possible pea stone mix is recommended with the 6/4 funnels
- Option for 6" only bollard funnel for larger pour opening
Stop fighting the signpost. Put the funnel where you need it and get the bollard filled.